Path: Top > Skripsi - D4 > Jurusan Teknik Sipil > Prodi Teknik Perancangan Jalan & Jembatan > 2014 > REGULER
Perencanaan Struktur Bawah Jembatan Anak Sungai Angke Joglo-Ulujami, Jakarta Selatan
Substructure Design of Anak Sungai Angke Bridge Joglo-Ulujami, Jakarta Selatan
Tugas Akhir, 001 / 2014 / TPJJUndergraduate Theses from JBPTPPOLBAN / 2018-09-03 15:06:05
Oleh : Regina Novianti - 101134020 & Silmi Azka - 101134028 (reginanovianti11@gmail.com; silmiazkaa@yahoo.com)
Dibuat : 2017-08-01, dengan 4 file
Keyword : Abutment, Pilar, Struktur Bawah Jembatan
Subjek : Abutment, Pier, Substructure
Pembangunan jalan tol sangat diperlukan terutama pada wilayah-wilayah yang telah tinggi tingkat perkembangannya, seperti kota Jakarta. Maka dari itu, dibuatlah salah satu prasarana transportasi jalan tol lingkar luar Jakarta atau Jakarta Outer Ring Road (JORR). Tol lingkar luar Jakarta adalah salah satu solusi untuk memecah kemacetan yang selama ini terjadi di Cawang dan Tomang. Pembangunan jalan tol ini terdiri dari pekerjaan jalan dan jembatan yang di dalamnya akan dibangun jembatan Anak Sungai Angke. Analisa dan perencanaan pada struktur bawah jembatan Anak Sungai Angke ini meliputi perhitungan pembebanan pada abutment dan pilar, kemudian kontrol stabilitas, kontrol kekakuan, dan kontrol kekuatan. Dari keempat tahapan tersebut diketahui bahwa dibutuhkan perencanaan pondasi, yaitu pondasi sumuran (caisson) pada pilar 1 dan 2 serta pondasi telapak pada abutment 1 dan 2. Berdasarkan hasil analisa, diperoleh dimensi dan kebutuhan tulangan sesuai perencanaan yang telah dihitung pada abutment dan pilar. Selain itu juga dibuat metode pelaksanaan yang seefisien mungkin agar memudahkan pekerjaan, serta rencana anggaran biaya yang dihitung dengan tepat sesuai referensi sehingga diperoleh nilai yang ekonomis dan dapat dipertanggung jawabkan. Kata kunci: Abutment, Pilar, Struktur Bawah Jembatan.
Deskripsi Alternatif :Highway construction is much needed especially in highly developed areas such as Jakarta. Therefore an outer ring highway transportation infrastructure is built in Jakarta, known as the JORR (Jakarta Outer Ring Road). The outer ring road is one of the solutions to divide the crowded traffic usually occurring in Cawang and Tomang. The construction of this highways consists of road work and bridge work, one of which is the construction of the Anak Sungai Angke bridge. Analysis and planning of the Anak Sungai Angke substructure include calculation of loading on the abutments and piers, then stability control, stiffness control, and strong control. Of these four stages, it is known that foundation planning is needed, that is the foundation sinks (caisson) on pier 1 and 2 as well as the footplate on abutment 1 and 2. Based on analysis results, dimension and reinforcement needs are obtained based on planning that has been calculated based on the abutments and piers. The method of implementation is also made to be as efficient as possible to ease the work, as well as budget plans which are calculated in accordance to reference to obtain economical and justifiable values. Keywords: Abutment, Pier, Substructure.
Beri Komentar ?#(0) | Bookmark
Properti | Nilai Properti |
---|---|
ID Publisher | JBPTPPOLBAN |
Organisasi | |
Nama Kontak | Erlin Arvelina |
Alamat | Jl. Trsn. Gegerkalong Hilir Ds. Ciwaruga |
Kota | Bandung |
Daerah | Jawa Barat |
Negara | Indonesia |
Telepon | 022 201 3789 ext. 168, 169, 239 |
Fax | 022 201 3889 |
E-mail Administrator | erlin.arvelina@polban.ac.id |
E-mail CKO | erlin.arvelina@polban.ac.id |
Print ...
Kontributor...
- Pembimbing: Ir. Geni Firuliadhim, M.T., Editor: Erlin Arvelina
Download...
File : DAFTAR - 101134020 & 101134028.pdf
(671739 bytes)
File : BAB 1 - 101134020 & 101134028.pdf
(389369 bytes)
File : BAB 2 - 101134020 & 101134028.pdf
(1207077 bytes)
File : BAB 5 - 101134020 & 101134028.pdf
(604221 bytes)