Path: Top > Skripsi - D4 > Jurusan Teknik Sipil > Prodi Teknik Perancangan Jalan & Jembatan > 2014 > REGULER

Perancangan Struktur Jembatan Jalan Raya pada Proyek Bogor Ring Road Seksi IIA, Kota Bogor

Structure Design of Highway Bridges in Bogor Ring Road Project Section IIA, Bogor City

Tugas Akhir, 003 / 2014 / TPJJ
Undergraduate Theses from JBPTPPOLBAN / 2018-09-03 15:06:05
Oleh : Rhamda Gumilar - 101134023 & Ryan Hariyono - 101134025 (rhamdamilan@yahoo.com; ryanhariyono@gmail.com)
Dibuat : 2017-08-01, dengan 4 file

Keyword : Struktur Jembatan, fly over, perancangan, metode konstruksi
Subjek : Bridge Structure, fly over, span changes, design, construction methods

Perancangan struktur jembatan jalan raya pada proyek Bogor Ring Road seksi IIA, Kota Bogor dengan struktur girder jenis PCI Girder dan untuk perancangan struktur utama lainnya yaitu kolom, dan kepala pilar. Tujuan dari perancangan struktur jembatan pada laporan tugas akhir ini adalah merencanakan struktur dari jalan layang (fly over) Bogor Ring Road Seksi IIA. Perancangan struktur jembatan yang telah ditinjau ini memiliki bentang PCI girder sepanjang 50 m. Perancangan ini didasari dengan peraturan-peraturan konstruksi Indonesia yang khususnya membahas tentang beton prategang, beton bertulang, serta peraturan pembebanan. Perancangan ini ada yang dilakukan secara manual dan ada pula yang dilakukan dengan menggunakan SAP 2000 dalam mencari nominal beban yang bekerja pada suatu komponen. Adapun hasil dari perancangannya adalah spesifikasi pada masing-masing komponen struktur. Hasil perancangan tersebut ialah spesifikasi struktur untuk parapet dengan menggunakan D19-90 mm untuk tulangan tarik, D19-90 mm untuk tulangan tekan, dan D13-200 mm untuk tulangan bagi, pelat lantai dengan menggunakan tulangan D16-60 mm untuk tulangan utama dan tulangan D13-90 mm untuk tulangan bagi, diafragma dengan menggunakan tulangan D19 untuk tulangan utama dan D12-200 mm untuk tulangan geser , serta PCI girder dengan menggunakan kabel strand sebesar 15,2 mm, kabel selubung tendon berdiameter 75 mm dengan jumlah tendon 5 buah pada masing-masingnya memiliki strand sebanyak 23 buah. Sedangkan, metoda kontruksi pada parapet menggunakan metoda cast in situ, pelat lantai menggunakan metoda cast in situ, PCI girder menggunakan metoda precast. Kemudian, untuk penempatan struktur PCI girder ke atas struktur titik tinjauan ini akan menggunakan metoda erection girder. Kata kunci: Struktur Jembatan, fly over, perancangan, metode konstruksi.

Deskripsi Alternatif :

The design of flyover structures in the project Bogor Ring Road section IIA , Bogor with girder structure type PCI Girder and design for the other main structure is pier, and pierhead. The purpose of the bridge design structure at this final report is planned structure of the flyover Bogor Ring Road Section IIA . The design of the bridge structure that have been reviewed has long PCI girder span of 50 m. The design is based on the Indonesian construction regulations that specifically discusses prestressed concrete, reinforced concrete, and loading regulations. These designs are done manually and some are done using SAP 2000 in a search for the nominal load work on a component. As a result of its design is the specification of each component of the structure. The result is the design specifications for parapet structure using D19-90 mm for tensile reinforcement , D19-90 mm for compressive reinforcement, and D13-200 mm for distributed reinforcement, slab using reinforcement D16-60 mm to main reinforcement and D13-90 mm for distributed reinforcement, diaphragm using reinforcement D19 for main reinforcement and D12-200 mm for shear reinforcement, and PCI girder using a cable strand of 15,2 mm, the tendon sheath cable diameter 75 mm with the amount of tendon 5 pieces, on each tendons have strand as many as 23 pieces. Meanwhile, the method of construction of the parapet using cast in situ method, slab using the cast in situ method,, and for PCI girder using the precast method.. Then, for the placement of the pci girder structure onto structure point of this review, will be using erection girder method. Keywords: Bridge Structure, fly over, span changes, design, construction methods.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakErlin Arvelina
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorerlin.arvelina@polban.ac.id
E-mail CKOerlin.arvelina@polban.ac.id

Print ...

Kontributor...

  • Pembimbing: Ambar Susanto, S.T.Si., M.T., Editor: Erlin Arvelina

Download...