Path: Top > Tugas Akhir - D3 > Jurusan Teknik Elektro > Program Studi Teknik Listrik > 2012
RANCANG BANGUN SIMULASI PROTEKSI GANGGUAN FASA PADA SISTEM DISTRIBUSI MENGGUNAKAN RELAY SEPAM 1000
DESIGN PROTECTION SIMULATOR PHASE FAULT OF DISTRIBUTION SYSTEM USING RELAY SEPAM 1000
Tugas Akhir, 024 / 2012 / TLIUndergraduate Theses from JBPTPPOLBAN / 2015-11-18 09:21:47
Oleh : Ridwan Satypa - 091321025
Dibuat : 2013-05-06, dengan 4 file
Keyword : Gangguan hubung singkat Antar Fasa, Over current Relay(OCR), SEPAM 1000
Sistem tenaga listrik terdiri dari pembangkit, sistem transmisi, dan distribusi. Dalam pengoperasiannya sistem tenaga listrik tidak lepas dari gangguan. Gangguan yang sering terjadi pada saluran udara ialah gangguan hubung singkat. Gangguan hubung singkat mengakibatkan terjadinya arus yang besarnya berlipat ganda dibandingkan arus nominal peralatan yang mengalami gangguan. Oleh karena itu, diperlukan pengujian pada simulasi hubung singkat untuk mengetahui nilai arus hubung singkat yang tepat untuk mendapat gambaran mengenai situasi arus hubung singkat khususnya dalam kaitannya dengan penyetelan alat-alat pengaman seperti OCR. Pada Proyek Akhir ini akan dilakukan pengujian arus hubung singkat yang diperlukan untuk menentukan setting OCR, sehingga bila terjadi gangguan hubung singkat, peralatan pengaman akan bekerja mengamankan bagian sistem yang terganggu sesuai yang diharapkan. Kata kunci : Gangguan hubung singkat Antar Fasa, Over current Relay(OCR), SEPAM 1000
Deskripsi Alternatif :Power system consisting of plant, transmission system, and distribution. In the operation of power systems are not free from interference. Disorder that often occurs in the airways are short circuit interruption. Short circuit current causing double the amount compared to the nominal current of the faulty equipment. Therefore, the short circuit tests are required in simulations to determine the value of short circuit current of the right to get an idea of a short circuit current situation, especially in relation to the adjustment of safety devices such as OCR. In this final will be a short circuit testing is needed to determine the settings for OCR, so if there is a short circuit, protective device will work to secure the affected system as expected. Keywords: Inter-phase short circuit interruption, Over current relay (OCR), SEPAM 1000
Beri Komentar ?#(0) | Bookmark
Properti | Nilai Properti |
---|---|
ID Publisher | JBPTPPOLBAN |
Organisasi | |
Nama Kontak | Erlin Arvelina |
Alamat | Jl. Trsn. Gegerkalong Hilir Ds. Ciwaruga |
Kota | Bandung |
Daerah | Jawa Barat |
Negara | Indonesia |
Telepon | 022 201 3789 ext. 168, 169, 239 |
Fax | 022 201 3889 |
E-mail Administrator | erlin.arvelina@polban.ac.id |
E-mail CKO | erlin.arvelina@polban.ac.id |
Print ...
Kontributor...
- Pembimbing 1: Sunarto, ST., M.Eng.
Pembimbing 2: Hari Purnama, Ir., M.Eng. , Editor: Erlin Arvelina
Download...
File : DAFTAR - 091321025.pdf
(632571 bytes)
File : BAB 1 - 091321025.pdf
(213946 bytes)
File : BAB 2 - 091321025.pdf
(648419 bytes)
File : BAB 5 - 091321025.pdf
(160440 bytes)