Path: Top > Skripsi - D4 > Jurusan Teknik Sipil > Prodi Teknik Perancangan Jalan & Jembatan > 2012
Analisis Biaya Siklus Hidup Pada Ruas Jalan Surya Sumantri Ditinjau Dari Biaya Pemeliharaan, Biaya Operasional Kendaraan, dan Biaya Polusi Udara
Life Cycle Cost Analysis On Road Surya Sumantri of Maintenance Costs, Operating Costs, and Cost of Air Pollution
Tugas Akhir, 008 / 2012 / TPJJUndergraduate Theses from JBPTPPOLBAN / 2018-09-03 15:05:48
Oleh : Rizki Erdy Herdian - 08124024
Dibuat : 2013-01-08, dengan 4 file
Keyword : Analisis Biaya Siklus Hidup
Subjek : Life Cycle Cost Analysis
Jalan Surya Sumantri merupakan jalan kolektor di Bandung dengan panjang masing-masing 1,05 km yang memiliki 2 lajur 2 arah terbagi. Menurut hasil dari studi kasus menyatakan bahwa Ruas Jalan Surya Sumantri memiliki nilai PCI 40 sehingga harus dilakukan pemeliharaan dengan memberikan pelapisan tambah (overlay). Disamping itu Ruas Jalan Surya Sumantri juga memiliki volume lalu lintas yang tinggi dan merupakan akses jalan antara Bandung-Jakarta sehingga harus segera dilakukan strategi pemeliharaan jalan. Dalam menentukan alternatif strategi pemeliharaan yang efektif dan efisien dapat menggunakan analisis biaya siklus hidup. Analisis biaya siklus hidup terdapat parameter-parameter antara lain biaya pengelola jalan, biaya pengguna jalan, dan biaya ekstrenal. Dalam tugas akhir ini memberikan batasan–batasan dalam parameter-parameter analisis biaya siklus hidup antara lain biaya pemeliharaan jalan menggunakan harga satuan pekerjaan 2010 untuk biaya pengelola, biaya operasional kendaraan (BOK) mengacu kepada LAPI ITB untuk biaya pengguna jalan, dan biaya polusi udara untuk biaya eksternal. Hasil dari Tugas Akhir ini didapatkan strategi pemeliharaan 4 merupakan jenis pemeliharaan jalan yang paling efektif dan efisien untuk Ruas Jalan Surya Sumantri selama 15 tahun dengan nilai IRI 4,5 m/km dan dengan bunga diskonto 2,5%, 3,5%, dan 4,5% didapatkan nilai NVP terkecil dengan biaya berturut-turut sebesarRp. 1.678.663.144.697, Rp. 1.451.163.309.996, dan Rp. 1.256.253.196.174.
Deskripsi Alternatif :The Road Surya Sumantri is a collector road streets in Bandung with a length of 1.05 miles each having two rows of two-way split. According to the results of case studies that have Sumantri Road 40 so that the PCI should be performed by providing a coating added maintenance (overlay). In addition Sumantri Road also has a high volume of traffic and the access road between Bandung - Jakarta so it must be carried out road maintenance strategy. In determining alternative maintenance strategies can be effective and efficient use of life cycle cost analysis. There are life cycle cost analysis parameters - parameters such as the cost of road management, road user charges, and expenses ekstrenal. In this thesis provides the limits in the parameter - parameter analysis of life cycle costs include maintenance costs using 2010 prices for the cost of the work unit manager, vehicle operating costs (BOK) refers to LAPI ITB for the road user fees, and fees for air pollution external costs. The results obtained from this Final 4 maintenance strategy is a kind of road maintenance is the most effective and efficient for Surya Sumantri Road for 15 years with IRI value of 4.5 m / km and with a discount rate of 2.5%, 3.5%, and 4, 5% NVP values obtainedwith the smallest row costs Rp. 1,678,663,144,697, Rp.1,451,163,309,996, and Rp. 1,256,253,196,174.
Beri Komentar ?#(0) | Bookmark
Properti | Nilai Properti |
---|---|
ID Publisher | JBPTPPOLBAN |
Organisasi | |
Nama Kontak | Erlin Arvelina |
Alamat | Jl. Trsn. Gegerkalong Hilir Ds. Ciwaruga |
Kota | Bandung |
Daerah | Jawa Barat |
Negara | Indonesia |
Telepon | 022 201 3789 ext. 168, 169, 239 |
Fax | 022 201 3889 |
E-mail Administrator | erlin.arvelina@polban.ac.id |
E-mail CKO | erlin.arvelina@polban.ac.id |
Print ...
Kontributor...
- Pembimbing: Lilian Diasti Dessi Widuri, SST., MT. , Editor: Erlin Arvelina
Download...
File : DAFTAR - 08124024.pdf
(846969 bytes)
File : BAB 1 - 08124024.pdf
(480236 bytes)
File : BAB 2 - 08124024.pdf
(427516 bytes)
File : BAB 6 - 08124024.pdf
(342595 bytes)