Path: Top > Skripsi - D4 > 2017 > Jurusan Teknik Konversi Energi > Program Studi Teknologi Pembangkit Tenaga Listrik > 2020

Perancangan Sistem Proteksi Petir Pada Gedung Power House PLTM Pasirjambu 2X2,52 MW

Design of Power House Lightning Protection System at PLTM Pasirjambu 2 x 2,52 MW

Skripsi, 032 / 2020 / TPTL
Undergraduate Theses from JBPTPPOLBAN / 2022-04-05 13:04:43
Oleh : Rizqi Nurtaqwa Ilahi - 161724025 (rizqi.nurtaqwa.tptl16@polban.ac.id)
Dibuat : 2022-04-05, dengan 4 file

Keyword : sambaran petir, PLTM, proteksi petir, pembumian
Subjek : lightning strike, mini hydro powerplant, lightning protection, grounding

Petir memiliki sifat melepaskan muatan dari awan ke benda terdekat dengan awan, menyebabkan suatu objek dengan ketinggian yang besar memiliki kemungkinan tersambar petir yang besar pula. Sambaran petir dapat memberikan kerugian yang cukup besar salah satunya dapat mengganggu kontinuitas pembangkit listrik. Menurut BMKG rata-rata kerapatan sambaran petir di Bandung sebanyak 12 kali sambaran pertahun per km2. PLTM Pasirjambu 2x2,52 MW terletak di kawasan Ciwidey Kabupaten Bandung. Gedung power house pada PLTM Pasirjambu 2x2,52 MW memiliki peranan penting pada kontinuitas pembangkit dan merupakan salah satu bangunan tertinggi di area PLTM Pasirjambu 2x2,52 MW sehingga kemungkinan gedung power house tersambar oleh petir sangatlah tinggi. Untuk meminimalisir kerugian akibat sambaran petir, maka pada gedung power house PLTM Pasirjambu 2x2,52 MW harus dilakukan perancangan sistem proteksi petir. Arus yang ditangkap oleh sistem proteksi petir kemudian dialirkan menuju pembumian, menyebabkan terjadinya tegangan langkah dan tegangan sentuh. Untuk memastikan tegangan langkah dan tegangan sentuh tersebut tidak membahayakan mahluk hidup, maka selanjutnya dilakukan perancangan sistem pembumian. Berdasarkan hasil soil boring log, area PLTM Pasirjambu 2x2,52 MW memiliki jenis tanah lempung lanauan, dimana jenis tanah tersebut memiliki resistivitas tanah sebesar 100 Ω-m. Sistem proteksi petir dengan menggunakan metode bola bergulir maupun metode sudut proteksi, gedung power house PLTM Pasirjambu 2x2,52 MW dengan ukuran panjang bangunan 34,95 m dan lebar bangunan 14,81m serta tinggi bangunan 12,92 m berada dalam zona proteksi. Sistem pembumian dengan konfigurasi elektroda pembumian tipe grid memiliki tahanan pembumian (𝑅𝐺) sebesar 1,54 Ω, 𝐸𝑚 = 1578,64 V <𝐸𝑇𝑜𝑢𝑐ℎ = 1700,4 V dan 𝐸𝑠= 730 V <𝐸𝑆𝑡𝑒𝑝 = 5691,4 V. Kata Kunci: sambaran petir, PLTM, proteksi petir, pembumian.

Deskripsi Alternatif :

Lightning has the property of releasing charge from the cloud to the object closest to the cloud, causing an object with a large height to have a high probability of being struck by lightning as well. Lightning strikes can cause considerable losses, one of which can disrupt the continuity of power plants. According to the BMKG, the average density of lightning strikes in Bandung is 12 times per year per km2. The Pasirjambu 2x2.52 MW PLTM is located in the Ciwidey area, Bandung Regency. The powerhouse building at the 2z2.52 MW Pasirjambu PLTM has an important role in the continuity of the generator and is one of the tallest buildings in the 2x2.52 MW PLTM Pasirjambu area, so the possibility of the powerhouse building being struck by lightning is very high. To minimize losses due to lightning strikes, the 2x2.52 MW PLTM Pasirjambu powerhouse building must design a lightning protection system. The current captured by the lightning protection system is then directed to earth, causing a step voltage and a touch voltage. To ensure that the step voltage and touch voltage do not harm living things, then the grounding system is designed. Based on the results of soil boring log, the Pasirjambu 2x2.52 MW PLTM area has a silty clay soil type, where the soil type has a soil resistivity of 100 -m. Lightning protection system using the rolling ball method and the angle of protection method, the PLTM Pasirjambu 2x2.52 MW powerhouse building with a building length of 34.95 m and a building width of 14.81 m and a building height of 12.92 m is in a protection zone. The grounding system with a grid type grounding electrode configuration has an earth resistance (𝑅𝐺) of 1,54 Ω, 𝐸𝑚 = 1578,64 V <𝐸𝑇𝑜𝑢𝑐ℎ = 1700,4 V dan 𝐸𝑠= 730 V <𝐸𝑆𝑡𝑒𝑝 = 5691,4 V. Keywords: lightning strike, mini hydro powerplant, lightning protection, grounding.

Beri Komentar ?#(1) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakErlin Arvelina
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorerlin.arvelina@polban.ac.id
E-mail CKOerlin.arvelina@polban.ac.id

Print ...

Kontributor...

  • Pembimbing 1: Drs. Dja'far Sodiq, S.T., M.T.

    Pembimbing 2: Erwin Yusuf, S.Si., M.T., Editor: Erlin Arvelina

Download...