Path: Top > Skripsi - D4 > 2017 > Jurusan Administrasi Niaga > Program Studi Manajemen Aset > KERMA > 2017
Analisis Kebutuhan Pengembangan Trotoar Di Jalan Ciumbuleuit Dan Jalan Gegerkalong Hilir Kota Bandung
Analysis Of Development Sidewalk In Ciumbuleuit road And Gegerkalong Hilir Road Bandung City
Tugas Akhir, 009 / 2017 / MAS-KERMAUndergraduate Theses from JBPTPPOLBAN / 2018-09-03 15:05:27
Oleh : Robi - 135246012 (robi.mas13@polban.ac.id)
Dibuat : 2018-02-21, dengan 4 file
Keyword : Trotoar, Analisis Kebutuhan, Deskriptif, Rancangan, Biaya
Subjek : sidewalk, Needs Analysis, Descriptive, Design, Cost
Menurut data dari Badan Pusat Statistik Jawa Barat, tingkat kepadatan penduduk mencapai 14.228 orang per kilometer persegi. Total jumlah penduduk di kota Bandung mencapai 2.393.633 orang. Kota Bandung memiliki jaringan jalan sepanjang 1.190,190 km dengan total 3.888 ruas jalan. Namun masih terdapat ruang milik jalan yang belum memenuhi standar tidak ada perkerasan pada trotoar, jalan berlubang dan tidak rata, tidak memiliki batas jalan, material yang menumpuk di bahu jalan dan bahkan paving block yang rusak. Oleh karena itu, tujuan penelitian ini adalah untuk menganalisis kebutuhan pengembangan trotoar di jalan Ciumbuleuit dan Gegerkalong Hilir. Untuk dapat mendefenisikan dan menyelesaikan masalah dalam penelitian ini, maka digunakan beberapa teori yang berkaitan. Teori yang digunakan dalam penelitian ini adalah analisis kebutuhan dan Peraturan Menteri Pekerjaan Umum Nomor 03/PRT/M/2014 yang terkait tentang trotoar. Selain itu, digunakan beberapa landasan normatif yang berkaitan tentang jalan dan trotoar. Jenis metode penelitian yang digunakan dalam penelitian ini adalah metode deskriptif. Metode Deskriptif adalah riset yang berupaya mengumpulkan data, menganalisis secara kritis data-data tersebut dan menyimpulkannya berdasarkan fakta-fakta pada masa penelitian berlangsung atau masa sekarang. Adapun cara mendapat kan data primer dan skunder dalam penelitian ini adalah dengan observasi dan Studi Dokumentasi. Objek yang diteliti pada penelitian ini berada pada Jalan Gegerkalong Hilir dan Jalan Ciumbuleuit. Jalur hijau tidak sesuai standar, lampu penerang dengan jarak 23 meter yang seharusnya 10 meter, tidak terdapat tempat duduk, tidak ada tempat sampah, pagar pengaman, perambuan yang rusak dan tidak terdapat halte. Lampu penerangan di Jalan Ciumbuleuit yang seharusnya dibangun sebanyak 390 unit dikurangi lampu penerang yang saat ini masih menyala jadi 346 unit lampu penerang yang dibutuhkan, tempat sampah 195 unit, tempat duduk 390 unit. Sedangkan di Jalan Gegerkalong Hilir lampu yang dibutuhkan 422 dikurangi lampu yang menyala 28 unit jadi yang dibangun 394 unit lampu penerangan, tempat sampah 211 unit, dan tempat duduk 422 unit. Total biaya pembangunan fasilitas di Jalan Ciumbuleuit sebesar Rp. 6.299.708.756 dan biaya pembangunan fasilitas di Jalan Gegerkalong Hilir sebesar Rp. 7.122.264.884 dan total pembongkaran dan pembangunan trotoar sebesar Rp. 3.514.112.471. Kata kunci: Trotoar, Analisis Kebutuhan, Deskriptif, Rancangan, Biaya.
Deskripsi Alternatif :According to data from the Central Bureau of Statistics of West Java, the population density reached 14,228 people per square kilometer. Bandung has 1.190,19 km road network with the total of 3.888 road segments. However, there is still road space that has not met the standard of no pavement on the sidewalk, potholes and uneven roads, no road boundaries, material piling up on the shoulders and even damaged paving blocks. Therefore, the purpose of this study was to analyze the need for pavement development on the Ciumbuleuit and Gegerkalong Hilir road. To be able to define and solve problems in this research, then used several related theories. The theory used in this research is the needs analysis and Peraturan Menteri Pekerjaan Umum Nomor 03/PRT/M/2014 Related to the sidewalk. In addition, several normative foundations relating to roads and sidewalks are used. Type of research method used in this research is descriptive method. Descriptive method is research that seeks to collect data, critically analyze the data and summarize it based on the facts during the study period or current. The way to get primary and secondary data in this research is by observation and Documentation Study. The object studied in this research is at Gegerkalong Hilir Street and Ciumbuleuit Street. The green line is not up to standard, lights with a distance of 23 meters that should be 10 meters, there is no seat, no trash, safety fence, broken skis and no stops. The lights on Ciumbuleuit street that should have been built as many as 390 units reduced the lights that are currently burning to 346 units of required lights, 195 bins, 390 units of seats. While at Gegerkalong Hilir street lamp required 422 less lights that blazed 28 units so that built 394 lights, 211 units of bins, and seats 422 units. Total cost of construction of facilities at Ciumbuleuit street Rp. 6,299,708,756 and the cost of construction of facilities at Gegerkalong Hilir street is Rp. 7122.264.884 and total dismantling and pavement construction of Rp. 3.514.112.471. Keywords: sidewalk, Needs Analysis, Descriptive, Design, Cost.
Beri Komentar ?#(0) | Bookmark
Properti | Nilai Properti |
---|---|
ID Publisher | JBPTPPOLBAN |
Organisasi | |
Nama Kontak | Erlin Arvelina |
Alamat | Jl. Trsn. Gegerkalong Hilir Ds. Ciwaruga |
Kota | Bandung |
Daerah | Jawa Barat |
Negara | Indonesia |
Telepon | 022 201 3789 ext. 168, 169, 239 |
Fax | 022 201 3889 |
E-mail Administrator | erlin.arvelina@polban.ac.id |
E-mail CKO | erlin.arvelina@polban.ac.id |
Print ...
Kontributor...
- Pembimbing: Marwansyah, S.E., M.Si., Ph.D., Editor: Erlin Arvelina
Download...
File : KELENGKAPAN TA - 135246012.pdf
(563192 bytes)
File : BAB 1 - 135246012.pdf
(481955 bytes)
File : BAB 2 - 135246012.pdf
(692988 bytes)
File : BAB 5 - 135246012.pdf
(91471 bytes)