Path: Top > Tugas Akhir - D3 > 2017 > Jurusan Teknik Sipil > Program Studi Teknik Konstruksi Gedung > 2018
Studi Banding Hasil Evaluasi Sistem Plambing Terhadap Kondisi Eksisting Di Proyek Rumah Susun Tni Bengpuspal Kiaracondong
Study Appearance Of Evaluation Of Plambing System On Existing Conditions In Household Project Tni Bengpuspal Kiaracondong
Tugas Akhir, 004 / 2018 / KGEUndergraduate Theses from JBPTPPOLBAN / 2018-10-12 08:45:53
Oleh : Roby Keany - 141111027 (robykeany82@gmail.com)
Dibuat : 2018-10-12, dengan 4 file
Keyword : Air bersih, Pipa, Plumbing
Subjek : Water, Pipe, Plumbing
Rumah Susun TNI-AD BENGPUSPAL yang terletak di Jalan Gatot Subroto No.372-Kota Bandung dibangun pada tahun 2016-2017 dan mulai dioperasionalkan mulai tahun 2017. Latar belakang dari tugas akhir ini adalah tidak adanya pengecekan ulang pada saluran air bersih dan banyaknya keluhan dari penghuni karena ketersediaan air bersih. Tujuan dari tugas akhir ini adalah untuk mengevaluasi sistem plumbing yang lama sehingga dapat diusulkan perbaikan sistem plambing tersebut agar sesuai dengan fungsi dan manfaatnya bagi penghuni rumah susun tersebut. Pelaksanaan tugas akhir ini dimulai dari evaluasi dengan metoda pengumpulan data primer dan sekunder, baik melalui observasi dan pengukuran langsung di lapangan juga melalui wawancara dengan pihak pengelola dan penghuni. Data hasil observasi dan pengukuran di lapangan ini selanjutnya digunakan sebagai dasar perhitungan dan hasil perhitungannya akan dibandingkan dengan standar yang berlaku. Hasil dari pemeriksaan dan perhitungan, kondisi kebutuhan tangki dan pipa yang terpasang dengan perhitungan sesuai. Sehingga tidak perlu dilakukan penggantian atau perombakan tangki dan pipa. Perlu adanya pengecekan kembali sebelum sanitasi pada ruangan tersebut digunakan. Kata kunci: Air bersih, Pipa, Plumbing.
Deskripsi Alternatif :Arrangement of Army BENGPUSPAL located at Jalan Gatot Subroto No.372-Bandung city was built in the year 2016-2017 and began operationalized from year 2017. Background of this final task is the existence of incompatibility with plumbing system in the flats, Both plumbing for the supply and distribution of clean water or plumbing for sewerage. The purpose of this final project is to evaluate the old plumbing system so that it can be proposed to improve the plumbing system to fit the function and its benefits for the apartment's residents. The implementation of this final project started from the evaluation with primary and secondary data collection methods, both through observation and direct measurement in the field also through interviews with the managers and occupants. The observation and measurement data in this field is then used as the basis for calculation and the result of the calculation will be compared with the applicable standard. The result of evaluation, condition of water tank and pipe is corresponding, so they don't need reconstruction for that. Check the plumbing system before use the room. Keywords: Water, Pipe, Plumbing.
Beri Komentar ?#(0) | Bookmark
Properti | Nilai Properti |
---|---|
ID Publisher | JBPTPPOLBAN |
Organisasi | |
Nama Kontak | Erlin Arvelina |
Alamat | Jl. Trsn. Gegerkalong Hilir Ds. Ciwaruga |
Kota | Bandung |
Daerah | Jawa Barat |
Negara | Indonesia |
Telepon | 022 201 3789 ext. 168, 169, 239 |
Fax | 022 201 3889 |
E-mail Administrator | erlin.arvelina@polban.ac.id |
E-mail CKO | erlin.arvelina@polban.ac.id |
Print ...
Kontributor...
- Pembimbing: Achmad Djihad, S.T., M.T., Editor: Erlin Arvelina
Download...
File : KELENGKAPAN TA - 141111027.pdf
(598220 bytes)
File : BAB 1 - 141111027.pdf
(104821 bytes)
File : BAB 2 - 141111027.pdf
(866942 bytes)
File : BAB 5 - 141111027.pdf
(172812 bytes)