Path: Top > Skripsi - D4 > 2017 > Jurusan Administrasi Niaga > Program Studi Manajemen Aset > KERMA > 2017
Perencanaan Revitalisasi Penerangan Jalan Umum Pada Ruas Jalan Utama Kota Cimahi
Revitalization Planning of Public Road Lighting On Primary Street Cimahi City
Tugas Akhir, 011 / 2017 / MAS-KERMAUndergraduate Theses from JBPTPPOLBAN / 2018-09-03 15:05:27
Oleh : Rusdinata - 135246013 (rusdinata.mas13@polban.ac.id)
Dibuat : 2018-02-21, dengan 4 file
Keyword : Perencanaan Kebutuhan aset, Penerangan Jalan Umum, Jalan Utama
Subjek : Needs Planning of Asset, Public Road Lighting, Primary Street
Kinerja penerangan jalan umum pada ruas jalan utama Kota Cimahi belum optimal, yaitu lampu yang mati, tiang karatan serta jumlah penerangan jalan umum dan jarak antar tiang belum sesuai dengan SNI 7391,2008. Tujuan dari proyek ini adalah membuat perencanaan revitalisasi penerangan jalan umum pada ruas jalan utama Kota Cimahi yang sesuai dengan SNI 7391,2008 dan estimasi biaya yang dibutuhkan untuk melakukan perencanaan tersebut.Dalam proyek ini teori adalah teori Perencanaan Kebutuhan aset yang disesuaikan dengan SNI 7391 2008 tentang Spesifikasi Penerangan Jalan di Kawasan Perkotaan dan perhitungan estimasi biaya untuk mendapatkan biaya penggantian lampu, pembongkaran, pembangunan, pemeliharaan dan operasional dengan menggunakan Analisis Harga Satuan Pekerjaan (AHSP). Metode penelitian yang digunakan adalah metode deskriptif menggunakan data primer dan data sekunder yang diperoleh melalui observasi dan studi dokumentasi. Hasil proyek ini adalah melakukan penggantian lampu yang mati 39 unit, pembongkaran 114 armature dan stang armature dari tiang PLN, pembangunan 305 penerangan jalan umum, pemangkasan 30 pohon yang menghalangi pencahayaan penerangam jalan umum dan total estimasi biaya yang dibutuhkan untuk perencanaan revitalisasi sebesar Rp. 11.030.908.428 Kata Kunci: Perencanaan Kebutuhan aset, Penerangan Jalan Umum, Jalan Utama.
Deskripsi Alternatif :The performance of public road lighting on primary street Cimahi City has not been optimal, they are the lamp off, the poles rusts and the amount of public road lighting and the distance between the poles are not in accordance with SNI 7391,2008. The purpose of this project is to make revitalization planning of public road lighting on primary street Cimahi City accordance with SNI 7391,2008 and cost estimation needed to do the planning. In this project theory is theory of Needs Planning Needs of assets adjusted to SNI 7391 2008 about Specification of Road Lighting in Urban Area and calculation of cost estimation to make cost of lamp replacement, disassembly, installation, maintenance and operation with using Analisis Harga Satuan Pekerjaan (AHSP). The research method used is descriptive method using primary and secondary of data with obtained through observation and documentation study. The result of this project is to replace 39 lamps, 114 armatures and stang armatures from poles of PLN, construction of 305 public road lighting, cuts 30 tree blocking illumination of public road lighting and total estimated cost required for revitalization planning of Rp. 11.030.908.428. Keywords: Needs Planning of Asset, Public Road Lighting, Primary Street.
Beri Komentar ?#(0) | Bookmark
Properti | Nilai Properti |
---|---|
ID Publisher | JBPTPPOLBAN |
Organisasi | |
Nama Kontak | Erlin Arvelina |
Alamat | Jl. Trsn. Gegerkalong Hilir Ds. Ciwaruga |
Kota | Bandung |
Daerah | Jawa Barat |
Negara | Indonesia |
Telepon | 022 201 3789 ext. 168, 169, 239 |
Fax | 022 201 3889 |
E-mail Administrator | erlin.arvelina@polban.ac.id |
E-mail CKO | erlin.arvelina@polban.ac.id |
Print ...
Kontributor...
- Pembimbing: Dr. Dra. Tri Setyowati, M.Si., Editor: Erlin Arvelina
Download...
File : KELENGKAPAN TA - 135246013.pdf
(1380225 bytes)
File : BAB 1 - 135246013.pdf
(263404 bytes)
File : BAB 2 - 135246013.pdf
(574807 bytes)
File : BAB 5 - 135246013.pdf
(174217 bytes)