Path: Top > Skripsi - D4 > Jurusan Teknik Sipil > Prodi Teknik Perancangan Jalan & Jembatan > 2014 > REGULER

Perancangan Struktur Bawah Jembatan Cibeureum Sisi Arah Ciawi Kabupaten Tasikmalaya, Jawa Barat

Substructures Design of the Cibeureum Bridge on the Side Direction of Ciawi Tasikmalaya Regency, West Java

Tugas Akhir, 002 / 2014 / TPJJ
Undergraduate Theses from JBPTPPOLBAN / 2018-09-03 15:06:05
Oleh : Sandi Hidayat - 101134026 & Yudha Satria - 101134031 (sandyhidy_01@yahoo.com; youdha.satria@gmail.com)
Dibuat : 2017-08-01, dengan 4 file

Keyword : Transportasi, Jembatan, Struktur Bawah, Abutment, Pier Pondasi Bored Pile, Pondasi Sumuran, Rencana Anggaran Biaya (RAB)
Subjek : Transportation, Bridges, Sub Structures , Abutment, Pier, Bored Pile, Caisson, Bill of Quantity (BOQ)

Transportasi merupakan kebutuhan yang sangat penting dalam kehidupan sosial ekonomi masyarakat karena transportasi memiliki fungsi untuk melancarkan hubungan antara dua atau lebih dari lokasi ke lokasi lainnya. Salah satu prasarana transportasi yang sangat penting untuk manusia adalah jembatan. Dalam rangka meningkatkan pelayanan kepada masyarakat, khususnya di Kabupaten Tasikmalaya, maka direncanakan sebuah pembangunan akses jalan ruas Ciawi-Singaparna. Akses jalan ruas Ciawi-Singaparna melewati beberapa lembah dan sungai yang dalam sehingga untuk menghubungkan ruas jalan tersebut diperlukan pembangunan beberapa jembatan.salah satu jembatan yang dibangun adalah jembatan Cibeureum Pada penyusunan Tugas Akhir ini akan dibahas mengenai perancangan struktur bawah jembatan Cibeureum sisi arah Ciawi, pada sisi tersebut terdapat 3 (tiga) bentang yang terdiri dari 1 (satu) abutment dan 3 (tiga) pier namun pada Tugas Akhir ini akan dirancang dengan menggunakan 2 (dua) bentang yang terdiri dari 1 (satu) abutment dan 2 (dua) pier. Dimensi yang digunakan pada abutment, pier dan pile cap merupakan dimensi yang dipergunakan di lapangan. Dari dimensi yang telah ada lalu dihitung berat struktur atas sebagai beban yang bekerja pada pondasi. Hasil dari perancangan ini adalah pada abutment (A1) digunakan jenis pondasi bored pile dengan jumlah 12 buah, diameter 80 cm dan kedalaman 10,7 m. Pada pier 1 (P1) digunakan jenis pondasi bored pile dengan jumlah 20 buah, diameter 80 cm dan kedalaman 7,6 m. Pada pier 2 (P2) digunakan jenis pondasi sumuran dengan jumlah 4 buah diameter 3,5 cm dan kedalaman 4 m. Rencana anggaran biaya pelaksanaan proyek dari hasil perhitungan adalah sebesar Rp 2.744.340.000 (dua milyar tujuh ratus empat puluh empat juta tiga ratus empat puluh ribu rupiah). Kata kunci: Transportasi, Jembatan, Struktur Bawah, Abutment, Pier Pondasi Bored Pile, Pondasi Sumuran, Rencana Anggaran Biaya (RAB).

Deskripsi Alternatif :

Transportation is a very important requirement in social and economic life on our society because transport has a function to connect a relationship between two or more location. One of the very important transportation infrastructure for human is a bridge. In order to improve the service to the community, especially in the Tasikmalaya district, then its planned to build an access of Ciawi-Singaparna roads. The access of Ciawi-Singaparna roads is through several valleys and deep river so as to connect these roads required the construction of several bridges. In this report will be explained about the design of the sub structure Cibereum bridge on side direction of Ciawi, on this side it have three (3) spans consisting of 1 (one) abutments and three (3) pier but in this report will be designed by only using 2 (two) spans consisting of 1 (one) abutment and 2 (two) pier. Dimensions that is used in the abutment, pier and pile cap is a dimension that is used in the field. Then the existing dimensions and weight of the structure above is calculated as the load working on the foundation. The results of this design is on the abutment (A1) is using bored pile foundation with amount of 12 piles, diameter of 80 cm and a depth of 10.7 m. In pier 1 (P1) is using bored pile foundation with amount of 20 piles, diameter of 80 cm and a depth of 7.6 m. At the pier 2 (P2) is using caisson foundation with amount of 4 piles, diameter of 3,5 cm and a depth of 4 m. The plan budget for the project is calculated in the amount of Rp 2.744.340.000 (two billion seven hundred and forty four million three hundred and forty thousand rupiah). Keywords: Transportation, Bridges, Sub Structures , Abutment, Pier, Bored Pile, Caisson, Bill of Quantity (BOQ).

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakErlin Arvelina
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorerlin.arvelina@polban.ac.id
E-mail CKOerlin.arvelina@polban.ac.id

Print ...

Kontributor...

  • Pembimbing: Hendry, Dip.Ing.HTL., M.T., Editor: Erlin Arvelina

Download...