Path: Top > Tugas Akhir - D3 > 2017 > Jurusan Teknik Sipil > Program Studi Teknik Konstruksi Gedung > 2019
Perencanaan Ulang Struktur Bawah Dan Biaya Pada Proyek Pembangunan Gedung G Rumah Sakit Mata Cicendo Bandung
Redesign Of Foundation Structure And Cost At G Building Cicendo Eye Hospital Bandung Construction Project
Tugas Akhir, 020 / 2019 / KGEUndergraduate Theses from JBPTPPOLBAN / 2020-04-16 15:50:56
Oleh : Shinta Julyana - 161111027 & Wulan Anggraeni - 161111031 (shintajuly.shinta@gmail.com)
Dibuat : 2020-04-16, dengan 4 file
Keyword : bored pile, pile cap, dan biaya
Subjek : bored pile, pile cap, and cost
Rumah sakit diharuskan memiliki fasilitas yang lengkap untuk menunjang kelancaran dalam pengoprasiannya, seperti Rumah Sakit Mata Cicendo yang menambahkan fasilitas baru yakni Gedung G, gedung ini memiliki total luas sebesar ±2845 m2. Gedung G ini akan difungsikan sebagai masjid, rumah singgah, ruang adminitrasi, ruang workshop, gudang umum, gudang medik, gudang alat tulis kantor, kamar tidur, ruang mesin, dan atap. Pondasi Gedung G ini menggunakan jenis pondasi bored pile dengan kedalaman mencapai ±5 m dari muka tanah setempat, sedangkan berdasarkan hasil pengujian SPT kedalaman dapat mencapai ±10 m dari muka tanah setempat. Berdasarkan permasalahan yang didapat, maka Tugas Akhir ini akan membahas mengenai perencanaan ulang struktur bawah pada proyek pembanguan Gedung G Rumah Sakit Mata Cicendo. Perencanaan pondasi pada proyek Gedung G ini dimulai dari perhitungan daya dukung dengan menggunakan Metode Meyerhof dan Terzaghi, menghitung efisiensi tiang grup, perhitungan distribusi beban untuk tiang grup, perhitungan penurunan tiang grup, perhitungan pergeseran kepala tiang, perhitungan daya dukung tarik tiang, perhitungan daya dukung lateral menggunakan persamaan Broms, perhitungan geser pons sesuai dengan SNI 2847:2013, perhitungan penulangan bored pile dan pile cap sesuai dengan SNI 2847:2013, membuat gambar rencana bored pile dan pile cap, dan membuat rencana anggaran biaya pekerjaan pondasi. Hasil yang didapatkan dari perencanaan ulang adalah bored pile menggunakan diameter 50 cm dengan kedalaman tiang 8,7 m dan tebal pile cap 1,3 m. Tipe pondasi P3 memiliki jumlah bored pile sebanyak 5 buah, dengan tulangan utama bored pile menggunakan 9D25 mm dan tulangan sengkang menggunakan Ø13-75 mm. Pile cap tipe P3 tulangan arah x pada bagian atas menggunakan D19-140 mm sebanyak 25 buah, dan tulangan arah x bagian bawah menggunakan D19-70 mm sebanyak 52 buah, pile cap tulangan arah y pada bagian atas menggunakan D19-140 mm sebanyak 17 buah, dan tulangan arah y bagian bawah menggunakan D19-70 mm sebanyak 35 buah. Tipe pondasi P4 memiliki jumlah bored pile sebanyak 6 buah, dengan tulangan utama bored pile menggunakan 9D19 mm dan tulangan sengkang menggunakan Ø13-75 mm. Pile cap tipe P4 tulangan arah x pada bagian atas menggunakan D19-140 mm sebanyak 30 buah, dan tulangan arah x bagian bawah menggunakan D19-70 mm sebanyak 61 buah, pile cap tulangan arah y pada bagian atas menggunakan D19-140 mm sebanyak 18 buah, dan tulangan arah y bagian bawah menggunakan D19-70 mm sebanyak 37 buah. Perkiraan biaya untuk pekerjaan pondasi adalah sebesar Rp 879.000.000,00 (Delapan ratus tujuh puluh sembilan juta rupiah). Kata kunci: bored pile, pile cap, dan biaya.
Deskripsi Alternatif :Hospitals are required to have complete facilities to support the smooth operation, such as Cicendo Eye Hospital which adds a new facility, Building G, this building has a total area of ±2845 m2. Building G will function as a mosque, shelter house, administration room, workshop room, public warehouse, medical warehouse, office stationery warehouse, bedroom, engine room, and roof. The foundation of Building G uses the type of bored pile foundation with a depth reaching ±5 m from the local land surface, while based on the results of testing the SPT depth can reach ±10 m from the local land surface. Based on the problems obtained, this Final Project will discuss the re-planning of the lower structure in the building project of the G Building of Cicendo Eye Hospital. Foundation planning in Building G project starts from the calculation of carrying capacity using Meyerhof and Terzaghi Method, calculating group pole efficiency, calculation of load distribution for group poles, calculation of group pole drop, calculation of pole head shift, calculation of pole pull capacity, carrying capacity calculation lateral using the Broms equation, calculation of sliding pons in accordance with SNI 2847: 2013, calculation of reinforcement of bored pile and pile cap in accordance with SNI 2847: 2013, making plan drawings for bored pile and pile cap, and making budget plans for foundation work. The results obtained from the re-planning are bored pile using a diameter of 50 cm with a depth of 8.7 m and thick pile cap 1.3 m. The P3 foundation type has 5 bored piles, with the main reinforcement of bored pile using 9D25 mm and stirrup reinforcement using Ø13-75 mm. The type of P3 pile cap x-direction reinforcement at the top using D19-140 mm 25 pieces, and x-direction reinforcement at the bottom using D19-70 mm 52 pieces, y-direction reinforcement pile cap at the top using D19-140 mm 17 pieces , and y-direction reinforcement at the bottom using D19-70 mm 35 pieces. The P4 foundation type has 6 bored piles, with the main reinforcement of bored pile using 9D19 mm and stirrup reinforcement using Ø13-75 mm. The type of P4 pile cap x-direction reinforcement at the top using D19-140 mm 30 pieces, and x-direction at the bottom reinforcement using D19-70 mm 61 pieces, y-direction reinforcement pile cap at the top using D19-140 mm 18 pieces, and y-direction reinforcement at the bottom using D19-70 mm 37 pieces. Estimated cost for foundation work is IDR 879,000,000.00 (Eight hundred seventy nine million rupiah). Keywords: bored pile, pile cap, and cost.
Beri Komentar ?#(0) | Bookmark
Properti | Nilai Properti |
---|---|
ID Publisher | JBPTPPOLBAN |
Organisasi | |
Nama Kontak | Erlin Arvelina |
Alamat | Jl. Trsn. Gegerkalong Hilir Ds. Ciwaruga |
Kota | Bandung |
Daerah | Jawa Barat |
Negara | Indonesia |
Telepon | 022 201 3789 ext. 168, 169, 239 |
Fax | 022 201 3889 |
E-mail Administrator | erlin.arvelina@polban.ac.id |
E-mail CKO | erlin.arvelina@polban.ac.id |
Print ...
Kontributor...
- Pembimbing 1: Ery Radya Juarti, S.T., M.T.
Pembimbing 2: Dr. Syahril, BSCE., M.T., Editor: Erlin Arvelina
Download...
File : KELENGKAPAN TA - 161111027 & 161111031.pdf
(1921442 bytes)
File : BAB 1 - 161111027 & 161111031.pdf
(334353 bytes)
File : BAB 2 - 161111027 & 161111031.pdf
(1111544 bytes)
File : BAB 6 - 161111027 & 161111031.pdf
(178891 bytes)