Path: Top > Tugas Akhir - D3 > Jurusan Teknik Elektro > Program Studi Teknik Listrik > 2014
Rancang Bangun Simulator Pengujian Vektor Jam Pada Transformator Daya 3 Fasa 100 VA
Design And Build Simulator Testing Vector Group On A Power Transformer 3 Phase 100 VA
Tugas Akhir, 005 / 2014 / TLIUndergraduate Theses from JBPTPPOLBAN / 2018-04-17 11:44:31
Oleh : Wildan Gustian Wibawa - 111321030 (gustian7th@gmail.com)
Dibuat : 2018-04-17, dengan 4 file
Keyword : Transformator, Paralel Transformator, Vektor Group
Subjek : A transformer, parallel a transformer, vector group
Transformator yang berfungsi sebagai sumber catu daya pada suatu jaringan, tentunya memiliki kapasitas daya terpasang yang terbatas. Sehingga jumlah keseluruhan beban yang disuplai oleh transformator tersebut, tidak boleh melebihi kapasitas daya pada transformator, karena kondisi beban lebih dapat mengakibatkan timbulnya panas dan menyebabkan kerusakan. Salah satu cara yang bisa dilakukan untuk mengatasi pembebanan berlebih pada transformator adalah dengan kerja paralel pada transformator tersebut. Syarat yang harus dipenuhi untuk melakukan kerja paralel transformator diantaranya adalah tegangan, frekuensi, urutan fasa dan vektor group trafo yang di paralelkan harus sama, agar trafo tersebut dapat bekerja secara optimal dan mencegah timbulnya arus pusar akibat paralel transformator yang tidak sama vektor grupnya. Oleh sebab itu, mengingat pentingnya pengetahuan mengenai vektor group pada sebuah transformator, maka tujuan dari proyek akhir ini adalah membuat simulator pengujian vektor grup pada transformator dengan cara metode pengukuran tegangan. Transformator yang digunakan adalah transformator 3 fasa dengan daya 100 VA dan vektor group yang disimulasikan adalah vektor group Dy1, Dy7 dan Dy11 dengan pengoperasian otomatis untuk mengubah rangkaian vektor grup sesuai hubungan yang telah di tentukan. Kata kunci: Transformator, Paralel Transformator, Vektor Group.
Deskripsi Alternatif :A transformer that serves as the source of the power supply on a network, would have a capacity of installed power is limited. So that the total load is supplied by the transformer, it should not exceed the capacity of the power transformer, because the condition can lead to greater incidence of heat and cause damage. One of the ways that can be done to cope with the excess of load on a transformer is to work in parallel on the transformer. Conditions that must be met in order to do work in parallel transformer such as voltage, frequency, phase sequence and vector group in parallel the transformer must be the same, so that the transformer can work optimally and prevent the incidence of umbilical flow due to the parallel transformer vector group is not the same. Therefore, given the importance of the knowledge of vector group on a transformer, then the purpose of this final project is to create a simulator test vector Group on measurement method by means of a transformer voltage. The transformer is a transformer 3 phase power 100 VA and the vector group's simulated vector group is Dy1, Dy7 and Dy11 with automatic operation and to change the set of vectors group comply relation that have been specified. Keywords: A transformer, parallel a transformer, vector group.
Beri Komentar ?#(0) | Bookmark
Properti | Nilai Properti |
---|---|
ID Publisher | JBPTPPOLBAN |
Organisasi | |
Nama Kontak | Erlin Arvelina |
Alamat | Jl. Trsn. Gegerkalong Hilir Ds. Ciwaruga |
Kota | Bandung |
Daerah | Jawa Barat |
Negara | Indonesia |
Telepon | 022 201 3789 ext. 168, 169, 239 |
Fax | 022 201 3889 |
E-mail Administrator | erlin.arvelina@polban.ac.id |
E-mail CKO | erlin.arvelina@polban.ac.id |
Print ...
Kontributor...
- Pembimbing 1: Asikin S. Y., S.T.
Pembimbing 2: Supriyanto, S.T., M.T., Editor: Erlin Arvelina
Download...
File : DAFTAR - 111321030.pdf
(272594 bytes)
File : BAB 1 - 111321030.pdf
(325492 bytes)
File : BAB 2 - 111321030.pdf
(653973 bytes)
File : BAB 5 - 111321030.pdf
(240471 bytes)