Path: Top > Skripsi - D4 > 2017 > Jurusan Administrasi Niaga > Program Studi Manajemen Aset > KERMA > 2017

Kebutuhan Aset Dan Biaya Penerangan Jalan Umum Di Ruas Jalan Amir Machmud Cimahi Dan Sariwangi KBB

The Need Of Assets Cost Of Road Lighting On Amir Machmud Road Cimahi And Sariwangi Road KBB

Tugas Akhir, 017 / 2017 / MAS-KERMA
Undergraduate Theses from JBPTPPOLBAN / 2018-09-03 15:05:27
Oleh : Yansen Kunumko - 125246025 (yansenkunum@gmail.com)
Dibuat : 2018-02-21, dengan 4 file

Keyword : Kebutuhan Aset, dan Biaya, Penerangan Jalan Umum
Subjek : Asset Needs, and Costs, Lighting of Public Roads

Dinas Perhubungan (Dishub) Kota Cimahi dan Dinas Bina Marga Kab. Bandung Barat memiliki banyak aset, satu di antaranya aset Penerangan Jalan Umum (PJU) yang berada diruas Jalan Amir Machmud dan Jalan Sariwangi, namun aset PJU yang ada belum sesuai standar. Proyek ini bertujuan untuk menghitung jumlah kebutuhan, jumlah biaya kekurangan PJU dan membuat jadwal serta prosedur pemeliharaan rutin PJU. Proyek ini menerapkan landasan teori perencanaan kebutuhan aset dan biaya. Metode dalam proyek ini menggunakan metode deskriptif dan teknik pengumpulan data menerapkan observasi, wawancara serta studi dokumentasi. Hasil menunjukan terjadi kekurangan aset PJU di ruas jalan Amir Machmud, yakni berupa komponen utama lampu sebanyak 80 unit, tiang PJU sebanyak 80 unit, dan panel listrik sebanyak 12 unit. PJU di ruas Jalan Sariwangi terjadi kekurangan komponen lampu sebanyak 40 unit, tiang PJU 40 unit, dan panel listrik sebanyak 12 unit. Jumlaha biaya kekurangan kebutuhan aset PJU total sebesar Rp 812.750.000. Rancangan jadwal dan prosedur pemeliharaan rutin. Adapun rancangan jadwal pemeliharaan dirancang mecakup pemeliharaan rutin Mingguan, Bulanan dan Tahunan. Prosedur pemeliharaan rutin PJU dimulai dari observasi, perencanaan, penyediaan kebutuhan, pelaksanaan pemeliharaan, pengadministrasian dan pelaporan. Kata kunci: Kebutuhan Aset, dan Biaya, Penerangan Jalan Umum.

Deskripsi Alternatif :

Agency of Transportation Cimahi Municipal and Dinas Bina Marga Regency West Bandung has many assets, one of which is the Public Road Lighting asset located on Amir Machmud Road and Sariwangi Road, but the existing Public Road Lighting assets have not been up to standard. The project aims to calculate the number of needs, the total cost of shortage of general street lighting and make routine maintenance schedules and procedures of street lighting. This project applies the theoretical basis of planning for asset and cost needs. Methods in this project using descriptive methods and data collection techniques apply observation, interviews and documentation studies. The result shows the lack of assets Public Road lighting on the road Amir Machmud, which is a main component of the lamp as much as 80 units, 80 units of poles, and electrical panels as many as 12 units. Lighting of public roads on Sariwangi road has a shortage of 40 lamps, 40 units of poles, and 12 units of electric panels. Amount of cost of shortage of asset needs Public Road lighting totaled Rp 812,750,000. Schedule design and routine maintenance procedures. The maintenance schedule design is designed to cover weekly, monthly and yearly maintenance. Routine maintenance procedures Public Road Lighting starts from observation, planning, procurement needs, maintenance implementation, administration and reporting. Keywords: Asset Needs, and Costs, Lighting of Public Roads.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakErlin Arvelina
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorerlin.arvelina@polban.ac.id
E-mail CKOerlin.arvelina@polban.ac.id

Print ...

Kontributor...

  • Pembimbing: Dr. A. Gima Sugiama, S.E., M.P., Editor: Erlin Arvelina

Download...