Path: Top > Tugas Akhir - D3 > 2017 > Jurusan Akuntansi > Program Studi Akuntansi > 2020
Perhitungan Harga Pokok Produksi Menggunakan Metode Full Costing Pada Konveksi Sarijadi
Calcolation of Cost of Good Manufactured method Full Costing on Konveksi Sarijadi
Tugas Akhir, 030 / AKU / 2020Undergraduate Theses from JBPTPPOLBAN / 2022-01-21 10:14:21
Oleh : Yulia Tiarasari - 175111032 (yuliatiarasari8@gmail.com)
Dibuat : 2022-01-21, dengan 4 file
Keyword : Cost of Production, Full costing, Factory Overhead Cost
Subjek : Harga Pokok Produksi, Full costing, Biaya Overhead Pabrik
Penelitian ini dilakukan di Konveksi Sarijadi Bandung yang merupakan salah satu perusahaan yang bergerak dalam home industry dibidang pakaian. Penelitian ini dilakukan untuk mengetahui harga pokok produksi yang dihitung oleh perusahaan dan harga pokok produksi yang dihitung dengan menggunakan metode full costing. Metode penelitian ini menggunakan metode analisis deskriptif, dan teknik pengumpulan data yang digunakan adalah dengan cara wawancara dan dokumentasi. Penelitian ini menghitung harga pokok produksi pada satu varian produk. Setelah dilakukan penelitian dan perhitungan harga pokok produksi dengan perhitungan metode full costing lebih besar dari perhitungan metode harga pokok produksi perusahaan. Hal ini disebabkan karena perusahaan tidak menghitung semua biaya overhead pabrik secara terperinci. Hasil dari perhitungan harga pokok produksi menurut metode perusahaan adalah Rp61.200,- sedangkan menurut hasil menggunakan metode full costing yaitu Rp63.200,-. Oleh karena itu sebaiknya perusahaan menghitung semua komponen biaya overhead pabrik dan menggunakan metode full costing.
Deskripsi Alternatif :This research was conducted at Konveksi Sarijadi Bandung which is one of the companies engaged in the clothing home industry. This research was conducted to determine the cost of production calculated by the company and the cost of production calculated using the full costing method. This research method uses descriptive-analytical methods, and the data collection techniques used are interviews and documentation. This study calculates the cost of production in one product variant. After doing research and calculation of the cost of production with the calculation of the full costing method is greater than the calculation of the cost of the production method of the company. This is because the company does not calculate all factory overhead costs in detail. The results of the calculation of the cost of production according to the company method are Rp.61.200,- while according to the results using the full costing method, which is Rp63.200,-. Therefore, the company should calculate all components of factory overhead costs and use the full costing method.
Beri Komentar ?#(0) | Bookmark
Properti | Nilai Properti |
---|---|
ID Publisher | JBPTPPOLBAN |
Organisasi | |
Nama Kontak | Erlin Arvelina |
Alamat | Jl. Trsn. Gegerkalong Hilir Ds. Ciwaruga |
Kota | Bandung |
Daerah | Jawa Barat |
Negara | Indonesia |
Telepon | 022 201 3789 ext. 168, 169, 239 |
Fax | 022 201 3889 |
E-mail Administrator | erlin.arvelina@polban.ac.id |
E-mail CKO | erlin.arvelina@polban.ac.id |
Print ...
Kontributor...
- Pembimbing: Mia Rosmiati, SIP., M.Si., Editor: Muhammad Abdillah Islamy, S.Pd
Download...
File : KELENGKAPAN TA - 175111032.pdf
(1815159 bytes)
File : BAB 1 - 175111032.pdf
(370883 bytes)
File : BAB 2 - 175111032.pdf
(291745 bytes)
File : BAB 5 - 175111032.pdf
(245676 bytes)