Path: Top > Tugas Akhir - D3 > 2017 > Jurusan Teknik Sipil > Program Studi Teknik Konstruksi Gedung > 2017

Metode Pelaksanaan Struktur Atas (Kolom, Balok Dan Pelat Lantai) Lantai 14 Sampai Lantai 17 Pada Proyek World Capital Tower Mega Kuningan Jakarta Selatan

Construction Method Of Uppper Structure (Column, Beam And Slab) Floor 14 To Floor 17 On World Capital Tower Project, Mega Kuningan, South Jakarta

Tugas Akhir, 014 / 2017 / KGE
Undergraduate Theses from JBPTPPOLBAN / 2017-11-08 07:41:12
Oleh : Adam Fahruddin Kahfi - 141111033 & Frita Febrianti Setiawan - 141111045 (fahruddinadam@gmail.com; fritafebrianti28@gmail.com)
Dibuat : 2017-11-08, dengan 4 file

Keyword : metode pelaksanaan, analisis umur beton, zona, pembongkaran acuan perancah umur 5 hari
Subjek : construction method, analysis of age of concrete, zoning, age of formwork dismantling on 5 days

Kota Jakarta merupakan tempat berdirinya gedung-gedung tinggi dimana itu berfungsi sebagai sarana bagi perusahaan yang ingin membuka kantor sendiri atau sebagai tempat berbisnis, dan salah satunya dibangun gedung World Capital Tower yang terdiri dari 51 lantai. Namun dengan intensitas lalu lintas dan aktivitas kota Jakarta yang tinggi, maka dibutuhkan metode pelaksanaan proyek yang tepat dan optimal. Tujuan dari penulisan tugas akhir ini adalah mengetahui metode pelaksanaan struktur kolom, balok dan pelat lantai pada proyek pembangunan gedung World Capital Tower dengan menggunakan software Sketch Up. Serta menganalisis perilaku umur beton balok yang belum mencapai mutu rencana dengan menggunakan software SAP 2000. Metode pelaksanaan proyek gedung World Capital Tower dari lantai 14 sampai lantai 17 menggunakan sistem zona, dimana setiap zona membutuhkan waktu pemasangan bekisting, pemasangan tulangan, pengecoran dan pembongkaran bekisting mencapai 8 hari. Pada saat pembongkaran bekisting balok di umur 5 hari, didapatkan hasil analisis bahwa balok sudah kuat menahan beban sendiri. Adapun balok yang tidak kuat masih membutuhkan bantuan perancah hingga umurnya mencapai mutu yang disyaratkan. Kata kunci: metode pelaksanaan, analisis umur beton, zona, pembongkaran acuan perancah umur 5 hari.

Deskripsi Alternatif :

Jakarta is the location of tall buildings where it serves as am means for a company that wants to open his own office or as a place of business, and one of them built its World Capital Tower that consisting of 51 floors. But with the intensity of traffic and activity of Jakarta are high, then it needs a proper and optimal project construction methods. The purpose of writing this final task is to know the construction methods of the columns, beams and slabs on World Capital Tower project by using Sketch Up software. As well as analyzing the behaviour of aged reinforced concrete beams that have yet to achieve the quality plan by using SAP 2000 software. Construction method of World Capital Tower project from 14th floor to 17th floor using zoning system. Where each zone need time during 8 days for formwork installation, installation of steel, casting and the dismantling of the formwork beam in day 5, obtained as a result of the analysis that is been strong beams hold the burden of its own. As for the beam not powerful still needs the help of scaffolding to the age of the quality plan. Keywords: construction method, analysis of age of concrete, zoning, age of formwork dismantling on 5 days.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakErlin Arvelina
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorerlin.arvelina@polban.ac.id
E-mail CKOerlin.arvelina@polban.ac.id

Print ...

Kontributor...

  • Pembimbing 1: Rahmat Permana, S.ST., M.Eng.

    Pembimbing 2: Heri Kasyanto, ST., M.Eng., Editor: Erlin Arvelina

Download...