Path: Top > Tugas Akhir - D3 > 2017 > Jurusan Teknik Sipil > Program Studi Teknik Konstruksi Gedung > 2017
Percepatan Penurunan Tanah Lempung Lunak Metode Preloading Dengan Prefabricated Vertical Drain (PVD) Untuk Mendukung Beban Timbunan Di Gedebage, Bandung
Acceleration Settlement Of Soft Clay Soil Preloading Method With Prefabricated Vertical Drain (PVD) For Supporting Landfill Load At Gedebage, Bandung
Tugas Akhir, 017 / 2017 / KGEUndergraduate Theses from JBPTPPOLBAN / 2017-11-08 07:55:34
Oleh : Anastasia Elvasarima Hasugian - 141111037 & Fery Tantowi - 141111044 (elvasarimahasugian12@gmail.com; ferytantowi170312@gmail.com)
Dibuat : 2017-11-08, dengan 4 file
Keyword : tanah lunak, gedebage, konsolidasi, preloading, PVD
Subjek : soft soil, gedebage, consolidation, preloading, PVD
Gedebage merupakan wilayah dengan perkembangan yang pesat dalam bidang pembangunan pada saat ini, tetapi kriteria tanah yang dimiliki cenderung lunak. Dalam perencanaan, beban tanah reklamasi akan diaplikasikan di atasnya. Namun dijumpai permasalahan, antara lain daya dukung tanah yang rendah, kuat geser dan permeabilitas yang rendah. Pada tanah lunak apabila diberi beban diatasnya, maka akan mengalami penurunan konsolidasi. Penurunan konsolidasi ini akan menimbulkan penurunan yang sangat besar dan waktu penurunan yang cukup lama. Dalam perencanaan, batas waktu untuk penurunan konsolidasi adalah 15 minggu sehingga perlu adanya rekayasa percepatan penurunan. Metode yang digunakan untuk mempercepat konsolidasi yaitu dengan melakukan pemasangan prefabricated vertical drain (PVD) yang dikombinasikan dengan beban timbunan atau preloading. Preloading yaitu pemberian beban yang bertujuan untuk memampatkan tanah dasar, sedangkan PVD bertujuan untuk mempercepat waktu pemampatan tanah. Dalam perencanaan, tinggi timbunan yang sekaligus menjadi beban preloading yaitu 2,8 meter dengan elevasi akhir 2,5 meter dari +665 mdpl di atas tanah dasar setelah terjadi penurunan sehingga kenaikan elevasi final +667,5 mdpl. Secara alamiah tanah akan mengalami penurunan sebesar 0,28 meter dengan waktu penurunan selama 159,6 tahun namun setelah dipercepat bisa mencapai konsolidasi 90% dengan waktu penurunan dicapai selama 15 minggu. Hasil perhitungan menunjukkan jarak dan konfigurasi PVD yang sesuai pada perencanaan pembangunan ini yaitu 1 meter dengan pola segiempat dengan biaya yang dikeluarkan yaitu Rp 1.214.109.612,- Kata kunci: tanah lunak, gedebage, konsolidasi, preloading, PVD.
Deskripsi Alternatif :Gedebage is a region with the highest development in construction sector at this moment, but criteria of soil is soft. In planning, the load of landfill will be applied on the top of soil. But there are found problems such as low soil carrying capacity, low shear strength and permeability. If soft soil is given a load on top, so it will happen compression of consolidation. Compression of consolidation will lead to a very large compression and a considerable compression time. In planning, the compression for consolidation decrease is 15 weeks so it needs to be accelerated. The method used to accelerate consolidation by installing prefabricated vertical drain (PVD) which is mixed with load of landfill or called preloading. The preloading method is the provision of temporary loads which head for compressing the base of soil, while PVD is head for accelerate the compression of the soil. In the planning, the height of landfill which also becomes a preloading load meters with the height of implementation landfill is 2,8 meters and the final height is 2.5 meters from +665 m on base of soil after compression is happened so that the final elevation increase +667,5 m. Naturally the soil will experience a decrease of 0.28 meters with compression time of 159.6 years but after accelerated it can reach a consolidation of 90% with time achieved for 15 weeks. The calculation results, distance and configuration of PVD in this development plans are 1 meter and square pattern to reaching with the budget plan in this working is Rp 1.214.109.612,- Keywords: soft soil, gedebage, consolidation, preloading, PVD.
Beri Komentar ?#(0) | Bookmark
Properti | Nilai Properti |
---|---|
ID Publisher | JBPTPPOLBAN |
Organisasi | |
Nama Kontak | Erlin Arvelina |
Alamat | Jl. Trsn. Gegerkalong Hilir Ds. Ciwaruga |
Kota | Bandung |
Daerah | Jawa Barat |
Negara | Indonesia |
Telepon | 022 201 3789 ext. 168, 169, 239 |
Fax | 022 201 3889 |
E-mail Administrator | erlin.arvelina@polban.ac.id |
E-mail CKO | erlin.arvelina@polban.ac.id |
Print ...
Kontributor...
- Pembimbing 1: M. Shouman, Dipl.Ing.HTL., M.T.
Pembimbing 2: Andri Krisnandi, S.ST., M.Eng., Editor: Erlin Arvelina
Download...
File : KELENGKAPAN TA - 141111037 & 141111044.pdf
(948647 bytes)
File : BAB 1 - 141111037 & 141111044.pdf
(470194 bytes)
File : BAB 2 - 141111037 & 141111044.pdf
(483082 bytes)
File : BAB 5 - 141111037 & 141111044.pdf
(172377 bytes)