Evaluasi Daya Dukung Pondasi Bored Pile Akibat Perbedaan Konfigurasi Tiang Pada Proyek Pembangunan Rumah Sakit Hermina Arcamanik
Evaluation Of The Supporting Capacity Of Bored Pile Foundation Due To Differences In Pile Configuration In The Hermina Arcamanik Hospital Construction Project
Tugas Akhir, 018 / 2021 / KGEUndergraduate Theses from JBPTPPOLBAN / 2022-06-13 10:16:54
Oleh : Annisa Indy Vaniartha - 181111036 & Gabriela Virginia Tambunan - 181111044 (gabriellatambunan93@yahoo.com)
Dibuat : 2022-06-13, dengan 4 file
Keyword : Evaluation, bored pile, carrying capacity, effectiveness, group pile configuration
Subjek : Evaluasi, bored pile, Kapasitas daya dukung, Efektifitas, Konfigurasi Tiang Grup
Pada pembangunan pengembangan RS Hermina direncanakan akan menggunakan pondasi bored pile dengan rencana tipe konfigurasi tiang berjumlah 6 jenis. Gedung RS Hermina ini berbentuk relatif simetris yang dimana bentuk konfigurasi sumbunya akan sama satu sama lain, tetapi terdapat beberapa perbedaaan konfigurasi yaitu pada titik titik A1 dengan D1, titik B1 dengan C1, titik A7 dengan D7, titik B7 dengan C7, titik A2 dengan D2, titik B2 dengan D2 dan titik A3 dengan D3. Perbedaan-perbedaan tersebut dapat disebabkan beberapa faktor, seperti perbedaan pembebanan disetiap titik atau dikarenakan struktur tanah yang berbeda. Evaluasi kapasitas daya dukung pondasi tiang grup ini dihitung berdasarkan lapangan seperti: pengujian sondir (metode Schmertmann-Nottingham), pengujian SPT (metode Mayerhoff 1976), dan data laboratorium. Evaluasi dilakukan dengan cara menghitung ulang pembebanan yang bekerja, melakukan kontrol terhadap kapasitas daya dukung tiang tunggal yang bekerja, efisiensi tiang grup pada masing-masing tipe pondasi, distribusi gaya dalam pada setiap tipe pondasi, penurunan, dan geser pons pondasi masih dalam kondisi aman di bawah batas syarat yang diharuskan. Setelah dilakukan evaluasi dengan menggunakan beban struktur atas hasil output ETABS dan sudah memenuhi syarat keamanan maka untuk titik C2 dan D2 menggunakan tipe pondasi P-5 yang berjumlah 5 tiang dan titik A1, B1, C1, D1, A2, B2, A3, D3, A7, B7, C7 dan D7 menggunakan tipe pondasi P-6 yang berjumlah 6 tiang dengan masing-masing pondasi berdiameter 600 mm dan yang mempunyai kedalaman 12 m. Penulangan bored pile yang digunakan yaitu untuk tulangan utama 8D22 dan sengkang spiral Ã10-150, sedangkan untuk pile cap digunakan tulangan D25-150.
Deskripsi Alternatif :In the construction of the development of the Hermina Hospital, it is planned to use a bored pile foundation with a plan of 6 types of pile configurations. The Hermina Hospital building is relatively symmetrical in which the configuration of the axes will be the same as each other, but there are several configuration differences, namely at point A1 with D1, point B1 with C1, point A7 with D7, point B7 with C7, point A2 with D2, point B2 with D2 and point B2 with D2, A3 with D3. These differences can be caused by several factors, such as differences in loading at each point or due to different soil structures. The evaluation of the bearing capacity of the pile foundations of this group was calculated based on field such as sondir test (Schmertmann-Nottingham method), SPT test (Mayerhoff method 1976), and laboratory data. The evaluation was carried out by recalculating the working load, controlling the carrying capacity of the working single pile, group pile efficiency for each type of foundation, distribution of internal forces in each type of foundation, settlement, and shearing of the foundation pons which was still in a safe condition at the base of the pile. Below the required limit. After evaluating using the structural load on the output of ETABS and meeting the safety requirements, for points C2 and D2 using the P-5 type of foundation which consists of 5 pillars and points A1, B1, C1, D1, A2, B2, A3, D3, A7, B7, C7 and D7 use the P-6 type of foundation which consists of 6 pillars with each foundation having a diameter of 600 mm and a depth of 12 m. Bored pile reinforcement used is for 8D22 main reinforcement and 10-150 spiral stirrups, while for pile cap used D25-150 reinforcement
Beri Komentar ?#(0) | Bookmark
Properti | Nilai Properti |
---|---|
ID Publisher | JBPTPPOLBAN |
Organisasi | |
Nama Kontak | Erlin Arvelina |
Alamat | Jl. Trsn. Gegerkalong Hilir Ds. Ciwaruga |
Kota | Bandung |
Daerah | Jawa Barat |
Negara | Indonesia |
Telepon | 022 201 3789 ext. 168, 169, 239 |
Fax | 022 201 3889 |
E-mail Administrator | erlin.arvelina@polban.ac.id |
E-mail CKO | erlin.arvelina@polban.ac.id |