Path: Top > Tugas Akhir - D3 > 2017 > Jurusan Teknik Sipil > Program Studi Teknik Konstruksi Gedung > 2021
Analisis Anggaran Biaya Pelaksanaan dan Penjadwalan Pekerjaan Struktur Pada Proyek Pembangunan Rumah Susun Sewa MBR Sawah Besar Kota Semarang
Budget Analysis of Implementation Costs and Scheduling of Structural Works on the Construction Project of MBR Sawah Besar Rental Flats in Semarang City
Tugas Akhir, 004 / 2021 / KGEUndergraduate Theses from JBPTPPOLBAN / 2022-05-23 11:27:33
By : Cindy Mutiara Bella - 181111004 & Mochamad Azmi Ghifari - 181111018 (cindy.mutiara.tkgd18@polban.ac.id )
Created : 2022-05-23, with 4 files
Keyword : Implementation Budget Plan, Scheduling, Microsoft Project
Subject : Rencana Anggaran Pelaksanaan, Penjadwalan, Microsoft Project
Dalam suatu pembangunan proyek konstruksi, manajemen konstruksi sangat penting untuk mengatur bagaimana memanfaatkan sumber daya yang ada agar dapat dikendalikan dengan efektif dan efisien guna tercapainya tujuan proyek secara optimal, yaitu tepat waktu, tepat mutu, dan tepat biaya. Oleh karena itu, diperlukan adanya pembuatan Rencana Anggaran Pelaksanaan (RAP) sebagai acuan penggunaan biaya dan penjadwalan pelaksanaan proyek sebagai acuan dalam memulai dan mengakhiri pekerjaan proyek. Beberapa data yang diperlukan dalam penyusunan RAP, yaitu seperti gambar kerja (gambar denah, gambar potongan, dan gambar detail), spesifikasi, dan Rencana Kerja dan Syarat-syarat (RKS). Selain itu ada hal yang diperlukan seperti Analisa Harga Satuan Pekerjaan (AHSP) dan daftar harga satuan alat, bahan serta upah. Sedangkan untuk penyusunan penjadwalan dibutuhkan volume pekerjaan dan konfigurasi tenaga kerja. Setelah itu, dapat dibuat penjadwalan menggunakan software Microsoft Project dalam bentuk barchart dan kurva S. Berdasarkan hasil perhitungan RAP pada Proyek Pembangunan Rumah Susun Sewa MBR Sawah Besar Kota Semarang diperoleh biaya sebesar Rp. 6.014.394.200,00 dan waktu pelaksanaan pekerjaan selama 90 hari kerja.
Description Alternative :In a construction project, management is very important to regulate how to utilize existing resources so that they can be controlled effectively and efficiently to achieve project objectives optimally, namely on time, right quality, and right cost. Therefore, it is necessary to make an Implementation Budget Plan (RAP) as a reference for using costs and scheduling project implementation to start and end project work. Some of the data needed in the preparation of the RAP, such as shop drawings (floor plan, section drawings, and detailed drawings), specifications, and Work Plans and Requirements (RKS). It also need such as Analysis of Work Unit Prices (AHSP) and a list of unit prices for tools, materials, and wages. As for scheduling, it takes work volume and workforce configuration. After that, scheduling can be made using Microsoft Project software in the form of a bar chart and an S curve. Based on the calculation of the RAP on the Construction Project of MBR Sawah Besar Rental Flats in Semarang City, a cost of Rp. 6.014.394.200,00 and the work execution time is 90 working days.
Property | Value |
---|---|
Publisher ID | JBPTPPOLBAN |
Organization | |
Contact Name | Erlin Arvelina |
Address | Jl. Trsn. Gegerkalong Hilir Ds. Ciwaruga |
City | Bandung |
Region | Jawa Barat |
Country | Indonesia |
Phone | 022 201 3789 ext. 168, 169, 239 |
Fax | 022 201 3889 |
Administrator E-mail | erlin.arvelina@polban.ac.id |
CKO E-mail | erlin.arvelina@polban.ac.id |