Path: Top > Tugas Akhir - D3 > 2017 > Jurusan Teknik Sipil > Program Studi Teknik Konstruksi Gedung > 2019

Analisis Elevator Gedung Sekretariat Daerah Kota Bogor Akibat Penambahan Kapasitas Beban

Elevator Analysis Of Bogor City Regional Secretariat Building Of Additional Load Capacity

Tugas Akhir, 023 / 2019 / KGE
Undergraduate Theses from JBPTPPOLBAN / 2020-04-16 16:08:34
Oleh : Dena Fauziah Putri - 161111035 & Fatimah Afiatin Muthmainnah - 161111039 (dena.fauziah.tkgd16@polban.ac.id)
Dibuat : 2020-04-16, dengan 4 file

Keyword : Elevator, Penambahan Kapasitas, Struktur Baja, Fondasi Bored Pile dan Raft
Subjek : Elevator, Capacity Increasing, Steel Structure, Bored Pile Foundation, and Raft

Gedung Sekretariat Daerah Kota Bogor merupakan gedung perkantoran dan pelayanan masyarakat. Demi menunjang kebutuhannya, gedung ini dibangun sebagai gedung bertingkat tinggi yang lekat kaitannya dengan transportasi vertical. Sehingga dalam perencanaannya, transportasi pada gedung ini perlu perhatian khusus. Pada gedung ini, transportasi yang digunakan adalah elevator. Semakin banyak pengguna gedung, maka semakin detail perencanaan struktur transportasinya. Selain itu, untuk menopang struktur yang khusus dibutuhkan juga perencanaan fondasi yang aman dan dapat memikul beban yang bekerja pada struktur elevator tersebut. Gedung ini telah memiliki struktur baja untuk rangka elevator, namun dibutuhkan analisis terhadap kondisi eksisting. Karena meningkatnya penghuni gedung, maka kapasitas elevatorpun ditingkatkan. Sehingga, analisis dilakukan terhadap penambahan kapasitas elevator dan dihitung kekuatan untuk struktur baja dan fondasi elevator tersebut. Dalam analisis ini penulis menggunakan software ETABS untuk pemodelan struktur dan meninjau kekuatannya sehingga dapat direncanakan perkuatan untuk struktur baja dengan jacketing beton bertulang sebagai struktur komposit. Kemudian penulis menganalisis kekuatan setiap elemen pada struktur elevator dan merencanakan sambungan yang aman. Setelah itu dilakukan analisis terhadap daya dukung fondasi dengan menghitungnya menggunakan data SPT dan sondir. Kemudian, dilakukan kontrol terhadap stabilitas guling dan geser fondasi. Lalu, penulis menghitung penurunan yang akan dialami oleh fondasi juga merencanakan penulangan fondasi tersebut. Pada bangunan elevator ini direncanakan fondasi bored pile dengan diameter 40 cm dan kedalaman 6 m tepat pada kedalaman tanah keras. Selain itu, direncanakan pula fondasi raft sebagai pile cap dengan dimensi 4x2 m. Kata Kunci: Elevator, Penambahan Kapasitas, Struktur Baja, Fondasi Bored Pile dan Raft.

Deskripsi Alternatif :

Gedung Sekretariat Daerah Kota Bogor is a building that is mainly used as an office affairs and a society service house. In order to support it's functional feature, the building was built in a model of skyscraper which needs a vertical transportation. Hence, a bigger attention needs to be put in this building's transportation system. Elevator is the vertical transportation device used in this building. The stronger structural strength in the elevator must be designed as more people will be working in the building. The stronger foundation designed is also needed so it can bear the loads that work on the elevator. The building uses steel material as the elevator frame. The capacity of the elevator needs to be increased as the consequence of the increasing number of workers. Therefore, analysis will be needed to measure the existing strength of the steel frame and the foundation to increase the capacity of the elevator. The analysis can be done with the ETABS Software in modelling the structure design and also to calculate the current strength. Consequently, steel structure reinforcement can be designed with the concrete jacketing method which turns the steel structure into a composite structure. Every elements of the elevator should be analyzed. To make the elevator safer, the joint of the elevator should be also redesigned. Analysis on strength of the foundation can be done by using the data from SPT Test and DPT Test. The next step is controlling the foundation stability from turning and sliding. Then, calculating the settlement of the foundation must be finished in order to design the foundation's steel reinforcement. The bored pile foundation will be installed in the reinforced elevator with the diameter of 40 cm and the depth of 6 m within the hard soil. The raft foundation is also planned as a pile cap with the dimension of 4x2 m. Keywords: Elevator, Capacity Increasing, Steel Structure, Bored Pile Foundation, and Raft.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakErlin Arvelina
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorerlin.arvelina@polban.ac.id
E-mail CKOerlin.arvelina@polban.ac.id

Print ...

Kontributor...

  • Pembimbing 1: Iskandar ST.Si., M.T.

    Pembimbing 2: Fisca Igustiany, S.ST., M.T., Editor: Erlin Arvelina

Download...