Path: Top > Tugas Akhir - D3 > 2017 > Jurusan Teknik Sipil > Program Studi Teknik Konstruksi Gedung > 2017
Analisa Metode Pelaksanaan Pelat Lantai Pada Proyek Pasar Baru Extension Di Kota Bandung
Analysis Of The Slab Construction Method On Pasar Baru Extension Project In Bandung
Tugas Akhir, 011 / 2017 / KGEUndergraduate Theses from JBPTPPOLBAN / 2017-11-08 07:24:29
Oleh : Muhamad Farhan Faturrahman - 141111019 & Yogie Subhan - 141111032 (yogi_subhan@yahoo.com)
Dibuat : 2017-11-08, dengan 4 file
Keyword : Half Slab, Shear Connector, Pracetak, Load Capacity, Metode Pelaksanaan
Subjek : Half Slab, Shear Connector, Precast, Load Capacity, method of construction
Studi ini bertujuan untuk mengetahui metode pelaksanaan yang ada di Proyek Pasar Baru Extension yang menggunakan metode konvensional. Kemudian dari metode yang ada diusulkan penggantian ke metode pracetak. Pelat pracetak yang digunakan adalah half slab. Sistem precast half slab menggunakan sistem pre-tensioning dimana kabel prategang ditarik terlebih dahulu pada suatu dudukan khusus yang telah disiapkan dan kemudian dilakukan pengecoran. Pada perancangan ini menggunakan perhitungan pembebanan yang dibandingkan dengan tabel load capacity dari suatu produk pelat lantai pracetak. Pada proses pengangkatan menggunakan perbandingan statika. Bentuk elemen pelat lantai pracetak mengikuti ukuran pada cutting list. Metode pelaksanaan pemasangan pelat lantai pracetak dibantu dengan alat angkat tower crane dengan metode sambungan yaitu sambungan basah. Sambungan pelat lantai pracetak menggunakan tulangan konektor dan shear conector. Pada toping dilakukan dengan pemasangan wiremesh dan dilakukan pengecoran ditempat dengan menggunakan bucket concrete. Dari hasil rancangan menggunakan sistem pelat lantai pracetak diperoleh pelat lantai pracetak half slab dengan ketebalan 80 mm dengan lebar 1,2 meter pada bentang 2,9 meter didapat load capacity sebesar 1.789,68 kg/m2.. Metode pelaksanaan pracetak dan metode pelaksanaan konvensional terdapat beberapa perbedaan pada cara kerja, alat, dan bahan yang digunakan. Metode pracetak lebih menguntungkan dari segi waktu, biaya, tenaga kerja. Kata kunci: Half Slab, Shear Connector, Pracetak, Load Capacity, Metode Pelaksanaan.
Deskripsi Alternatif :The purpose of this study is to find out the construction method that in the Pasar Baru Extension Projects using conventional methods. Then from the existing method proposed the replacement to the precast method. Precast slab is using half slab. The half precast slab system using a pretension system cable tensioning which is drawn first on a special holder which has been prepared and then done casting. On the design of the load calculation using this compared to a table of load capacity of a prefabricated floor plate of the product. On the process of appointment using comparative statics. Form elements are prefabricated floor plates follow the size on the cutting list. The mounting plate of the implementation method of precast slab assisted by lifting tower crane with tool connection method i.e. the connection wet. Precast slab connection using reinforcement and shear connector. On a topping done with wiremesh installation and on-site casting is done by using a concrete bucket. From the results of the design using precast slab system retrieved the half slab thick of 80 mm with a width of 1.2 meters in span of 2.9 meters gained load capacity of 1,789.68 kg/m2. The conventional method of construction of the prepress there is some difference in the way things work, tools, and materials used. Precast method is more beneficial in terms of time, cost, labor. Keywords: Half Slab, Shear Connector, Precast, Load Capacity, method of construction.
Beri Komentar ?#(0) | Bookmark
Properti | Nilai Properti |
---|---|
ID Publisher | JBPTPPOLBAN |
Organisasi | |
Nama Kontak | Erlin Arvelina |
Alamat | Jl. Trsn. Gegerkalong Hilir Ds. Ciwaruga |
Kota | Bandung |
Daerah | Jawa Barat |
Negara | Indonesia |
Telepon | 022 201 3789 ext. 168, 169, 239 |
Fax | 022 201 3889 |
E-mail Administrator | erlin.arvelina@polban.ac.id |
E-mail CKO | erlin.arvelina@polban.ac.id |
Print ...
Kontributor...
- Pembimbing 1: Ir. Susilahadi, M.T.
Pembimbing 2: Muchtar, S.ST., M.T., Editor: Erlin Arvelina
Download...
File : KELENGKAPAN TA - 141111019 & 141111032.pdf
(858323 bytes)
File : BAB 1 - 141111019 & 141111032.pdf
(497187 bytes)
File : BAB 2 - 141111019 & 141111032.pdf
(841277 bytes)
File : BAB 5 - 141111019 & 141111032.pdf
(529171 bytes)