Path: Top > Skripsi - D4 > Jurusan Teknik Sipil > Prodi Teknik Perancangan Jalan & Jembatan > 2012
PERANCANGAN SHELTER TRANS METRO BANDUNG DAN DAMRI BESERTA FASILITASNYA PADA RUAS JALAN ELANG, KOTA BANDUNG
DESIGNING OF TRANS METRO BANDUNG AND DAMRI SHELTER WITH FACILITY AT ELANG ROAD, BANDUNG CITY
Tugas Akhir, 012 / 2012 / TPJJUndergraduate Theses from JBPTPPOLBAN / 2018-09-03 15:05:48
By : Tatang Bahlawan - 08124027
Created : 2013-01-08, with 4 files
Keyword : Halte, Perancangan Trotoar, TMB, Damri
Penelitian dilakukan berdasarkan permasalahan yang ada pada Ruas Jl. Elang kota Bandung Barat. Ruas jalan ini memiliki halte yang memadai namun mengakibatkan kemacetan oleh karena itu meningkatnya kecepatan kendaraan dilakukan pemindahan halte Trans Metro Bandung adan Damri. Metode yang digunakan untuk merancang halte pada berdasarkan Pedoman teknis Perekayasaan tempat Pemberhentian kendaraan penumpang Umum, dengan menghitung jumlah penumpang, jumlah pejalan kaki dan jumlah bus TMB maupun Damri. Dengan Mengakomodir keinginan pengguana melalui penyebaran kuesioner. Dari hasil survai didapat rencana Halte Trans Metro bandung adalah Halte Tertutup serta untuk Halte damri pengguna menginginkan Halte Terbuka. Biaya untuk Perancangan adalah Rp. 192,072,783.94 dan lamanya proyek selama 70 hari pelaksanaan. Kata Kunci: Halte, Perancangan Trotoar, TMB, Damri
Description Alternative :The study was conducted based on the existing problems in Toll Road. West Bandung eagle. These roads have adequate shelter, but cause congestion by increasing the speed of the vehicle as it made the transfer of TMB and Damri shelter. The method used to design a bus stop on the spot based on the technical guideline Engineering General Dismissal of passenger vehicles, by counting the number of passengers, number of pedestrians and the amount of TMB and Damri bus. With a desire to accommodate the user through the deployment of a questionnaire. Survey results obtained from TMB stop the plan is closed and shelter to shelter users want a shelter Damri Open. The cost for design is Rp. 192,072,783.94 And duration of the project during the 70 days of implementation.
Give Comment ?#(10) | Bookmark
Property | Value |
---|---|
Publisher ID | JBPTPPOLBAN |
Organization | |
Contact Name | Erlin Arvelina |
Address | Jl. Trsn. Gegerkalong Hilir Ds. Ciwaruga |
City | Bandung |
Region | Jawa Barat |
Country | Indonesia |
Phone | 022 201 3789 ext. 168, 169, 239 |
Fax | 022 201 3889 |
Administrator E-mail | erlin.arvelina@polban.ac.id |
CKO E-mail | erlin.arvelina@polban.ac.id |
Print ...
Contributor...
- Pembimbing: Yusmiati Kusuma, SST., M.Sc. , Editor: Erlin Arvelina
Downnload...
File : DAFTAR - 08124027.pdf
(673442 bytes)
File : BAB 1 - 08124027.pdf
(348566 bytes)
File : BAB 2 - 08124027.pdf
(234778 bytes)
File : BAB 6 - 08124027.pdf
(212054 bytes)